Printable checklist
Labs, gowning rooms and the desks beside them
Very few research buildings hold only labs. A wet-lab suite opens onto a row of write-up desks, a gowning room leads into a controlled room, and a floor of conference rooms, a kitchen and restrooms serves the same scientists. Loop cleans both halves on one visit plan, giving every room its own task list so the controlled space and the meeting room are never treated alike.
The region is full of buildings like this: biotech suites along the bay in South San Francisco, research and development space around Palo Alto, and university-linked labs and startup incubators in Berkeley.
Your procedure becomes the visit list
Each lab writes its own rules, and those rules lead. Before the first visit, the lab manager or safety lead walks the space with us and the written procedure is turned into a visit list: which rooms are cleaned first, what crews put on at each entry, which agents, wipes and mops are approved for each room, and how often each surface is due.
Crews work that list room by room. Supervisors run quality inspections against the same document, so the check measures what the lab asked for rather than a generic standard. When the procedure is revised, the visit list is rewritten to match before the next visit.
Working inside a controlled room
At the cleanroom entry, crews gown in the sequence the room requires and carry in only the supplies on its list. Work starts at the cleanest point of the room and moves toward the exit, top to bottom, so particles travel down and out rather than across finished surfaces.
Walls, pass-through exteriors, carts, door hardware and floors are cleaned with the low-lint materials and agents the procedure names, and each mop head and wipe stays with the room it is assigned to. Where the room keeps a cleaning log, the crew signs it before leaving.
Frequency follows the room, not the calendar of the building. A room in daily production use might need floors and touch points every visit, while a rarely opened suite can follow a weekly cycle. Gowning rooms and airlock floors usually sit on the shortest cycle of all, because every entry starts there. The procedure records each frequency, and the visit plan carries it through.
Wet labs, benches and support rooms
In open wet labs, floors are mopped with the solution the lab specifies, sinks and counters are wiped, and fume hood exteriors get a wipe-down along with the sash handles. Bench tops that staff have cleared are cleaned, while instruments, samples and notebooks stay exactly where they were placed.
Crews take out the general trash and recycling, fit fresh liners, and refill soap and paper-towel dispensers. Glass-wash rooms, cold-room floors and equipment corridors join the list whenever the lab names them, each on the frequency the procedure sets.
Write-up desks, meeting rooms and the kitchen
Scientists spend a good part of the day away from the bench, at write-up desks, in project meetings and in the kitchen. Those rooms get Loop’s regular workplace routine: desks and meeting tables wiped, interior glass cleared of smudges, carpets vacuumed and the kitchen and restrooms cleaned on every visit.
The lobby and visitor sign-in counter come first on the list, since that is where partners and investors form their first impression. Shared printers, phone handsets and the coffee machine handles are wiped as part of the same route. Teams that keep long hours can add a daytime porter for restroom and kitchen checks, alongside recurring janitorial services after hours.
New suites, fit-outs and move-ins
A newly built lab suite carries construction dust on ledges, inside casework and across floors before any equipment arrives. Our post-construction cleaning removes it in stages, from high surfaces to the floor, and hands the space back ready for the lab’s own commissioning checks.
Building management receives a certificate of insurance before work begins. Every cleaner is background-checked before Loop puts them forward for badge access or escorts, and the company is bonded, insured and covered by workers’ compensation.
Planning the first visit
The quote starts with a walkthrough of both halves of the building, lab and office, and the procedure documents for any controlled rooms. From that, you get a written quote and a visit plan timed around experiments, deliveries and the hours your team is on site. Request your walkthrough to get started.
A few useful answers
Common questions.
Do your crews gown before entering a cleanroom?
Yes. Crews gown at the entry in the order your room’s procedure sets and bring in only the materials it lists.
Can you use the cleaning agents our lab has already approved?
Yes. Each room is cleaned with the agents, wipes and mops your procedure names, in the sequence it calls for.
What happens to instruments and samples left on a bench?
They stay exactly where staff left them. Crews clean cleared bench surfaces and the floors, sinks and fixtures around the work.
When do visits happen in a lab that runs experiments late?
Visits are set for the window your lab chooses, often late evening or early morning, and a room with a run in progress can move to the next visit.
Can the lab floors and the office floors share one cleaning schedule?
Yes. Labs, controlled rooms, offices and the kitchen sit on one visit plan, with a separate task list and frequency for each room.
Services

